Home Suisse
  Solutions
Produits
Conseil et Vente
Prestations
Support et Service
Actualité
A propos
Contact   Suisse
 
Solutions  
 
Aérospacial (en)
 
 
Agriculture
 
 
Gestion des équipements (en)
 
 
Automobile (en)
 
 
TruStories Chantier & Construction (en)
 
 
Cadastre (en)
 
 
TruStories Génie civil (en)
 
 
TruStories Forensics & Public Safety
 
 
Industrie (en)
 
 
Exploitation & Exploration (en)
 
 
TruStories Auscultation (en)
 
 
 Man-Made Structures
 
 
  Automated Deformation Monitoring Apollo Bridge, Bratislava, Slovakia
 
 
  Volume computation, Bonfol special waste
 
 
  Track Monitoring Traunstein, Germany
 
 
  Real Time GNSS Bridge Monitoring
 
 
  Monitoring of Rail Tracks and Construction Site
 
 
  Monitoring of Dikes with 3D Laser Scanning
 
 
  First Monitoring Project in Slovenia
 
 
  Owen Street Level Crossing, Tipton
 
 
  Urban Excavation
 
 
  Rail bridge reconstruction
 
 
  Burj Dubai
 
 
  Al Hamra Tower
 
 
  Hong Kong Airport Express Line
 
 
  Jiangyin Bridge, China
 
 
  Excavation Monitoring Ennetbaden, Switzerland
 
 
  Ski Lift Monitoring, Zermatt, Switzerland
 
 
  Rock Stability Monitoring, Interlaken, Switzerland
 
 
  Monitoring Land Forms in the Swiss Alps
 
 
  Northern Italian Reservoir
 
 
  GPS along the Danube
 
 
  Sydney Opera House
 
 
  Tsing Ma bridge - Hong Kong
 
 
  Yang-Pu bridge - Shanghai
 
 
  Akashi Strait suspension
 
 
  Vereina Tunnel - Switzerland
 
 
  Hornberg Reservoir
 
 
  Deformation monitoring
 
 
 Natural Phenomenons
 
 
Autres (en)
 

Burj Dubai

Rising High with GPS Network
"The system has proven to be fantastic! We have used our Leica GX1200, TPS1201 and Nivel 220 systems all the way!" Reaching top of concrete for the Burj tower at Level 156, at level 585.7 m, Chief Surveyor Douglas Hayes was impressed...
Mid November, Burj Dubai reached the height of 601 m, making the structure the tallest tower in the world. When completed in 2008 it will be the world’s tallest building, nearly twice the size of New York’s Empire State Building and higher than the current title holder, the Taipei Financial Center (Taipei 101) in Taiwan. The final height is being kept secret. Not a secret, on the other hand, is the unique monitoring system Leica Geosystems developed together with Douglas Hayes, Chief Surveyor of Burj Dubai.

Reaching top of concrete for the Burj tower at Level 156, at level 585.7 m, Douglas Hayes was impressed: "We have used our Leica GX1200, TPS1201 and Nivel 220 systems all the way - the system has proven to be fantastic. Vertical walls are straight, lift shafts are too - standard deviations of concrete core walls are generally around 7mm. At the very top, I have computed the mean displacement of all core walls: delta Easting =  0mm, delta Northing = 5mm from design position. Of course this quality has come about due to a lot of effort on all sides - not just survey.  But for our part I am very pleased with the way things have gone! The system has also allowed me to monitor the structure continuously and remotely, from a dynamic perspective as well as from a long term one, to quite amazing accuracy."


 
 

Produits concernés

Leica GPS1200+
Systèmes GPS1200+ pour la topographie  plus
Leica GRX1200 Series
Récepteurs de référence GPS haute performances   plus
Leica Nivel210/Nivel220
Inclinomètre de précision pour auscultation structurelle  plus
Leica GNSS Spider
Professional Business Solutions for GNSS Networks  plus